{"id":9766,"date":"2023-04-25T05:48:05","date_gmt":"2023-04-25T03:48:05","guid":{"rendered":"https:\/\/bbr.news\/?p=9766"},"modified":"2023-04-24T10:22:32","modified_gmt":"2023-04-24T08:22:32","slug":"safe-nuclear-power-plant-dismantling","status":"publish","type":"post","link":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling","title":{"rendered":"Safe nuclear power plant dismantling"},"content":{"rendered":"<div class=\"shariff shariff-align-flex-end shariff-widget-align-flex-end\" data-services=\"facebook\" data-url=\"https%3A%2F%2Fbbr.news%2Fen%2Fsafe-nuclear-power-plant-dismantling\" data-timestamp=\"1682331752\" data-hidezero=\"1\" data-backendurl=\"https:\/\/bbr.news\/en\/wp-json\/shariff\/v1\/share_counts?\"><ul class=\"shariff-buttons theme-round orientation-horizontal buttonsize-small\"><li class=\"shariff-button twitter shariff-nocustomcolor\" style=\"background-color:#595959\"><a href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Fbbr.news%2Fen%2Fsafe-nuclear-power-plant-dismantling&text=Safe%20nuclear%20power%20plant%20dismantling\" title=\"Bei X teilen\" aria-label=\"Bei X teilen\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#000; color:#fff\" target=\"_blank\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path fill=\"#000\" d=\"M14.258 10.152L23.176 0h-2.113l-7.747 8.813L7.133 0H0l9.352 13.328L0 23.973h2.113l8.176-9.309 6.531 9.309h7.133zm-2.895 3.293l-.949-1.328L2.875 1.56h3.246l6.086 8.523.945 1.328 7.91 11.078h-3.246zm0 0\"\/><\/svg><\/span><\/a><\/li><li class=\"shariff-button facebook shariff-nocustomcolor\" style=\"background-color:#4273c8\"><a href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fbbr.news%2Fen%2Fsafe-nuclear-power-plant-dismantling\" title=\"Bei Facebook teilen\" aria-label=\"Bei Facebook teilen\" role=\"button\" rel=\"nofollow\" class=\"shariff-link\" style=\"; background-color:#3b5998; color:#fff\" target=\"_blank\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 18 32\"><path fill=\"#3b5998\" d=\"M17.1 0.2v4.7h-2.8q-1.5 0-2.1 0.6t-0.5 1.9v3.4h5.2l-0.7 5.3h-4.5v13.6h-5.5v-13.6h-4.5v-5.3h4.5v-3.9q0-3.3 1.9-5.2t5-1.8q2.6 0 4.1 0.2z\"\/><\/svg><\/span><\/a><\/li><li class=\"shariff-button linkedin shariff-nocustomcolor\" style=\"background-color:#1488bf\"><a href=\"https:\/\/www.linkedin.com\/sharing\/share-offsite\/?url=https%3A%2F%2Fbbr.news%2Fen%2Fsafe-nuclear-power-plant-dismantling\" title=\"Bei LinkedIn teilen\" aria-label=\"Bei LinkedIn teilen\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#0077b5; color:#fff\" target=\"_blank\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 27 32\"><path fill=\"#0077b5\" d=\"M6.2 11.2v17.7h-5.9v-17.7h5.9zM6.6 5.7q0 1.3-0.9 2.2t-2.4 0.9h0q-1.5 0-2.4-0.9t-0.9-2.2 0.9-2.2 2.4-0.9 2.4 0.9 0.9 2.2zM27.4 18.7v10.1h-5.9v-9.5q0-1.9-0.7-2.9t-2.3-1.1q-1.1 0-1.9 0.6t-1.2 1.5q-0.2 0.5-0.2 1.4v9.9h-5.9q0-7.1 0-11.6t0-5.3l0-0.9h5.9v2.6h0q0.4-0.6 0.7-1t1-0.9 1.6-0.8 2-0.3q3 0 4.9 2t1.9 6z\"\/><\/svg><\/span><\/a><\/li><li class=\"shariff-button xing shariff-nocustomcolor\" style=\"background-color:#29888a\"><a href=\"https:\/\/www.xing.com\/spi\/shares\/new?url=https%3A%2F%2Fbbr.news%2Fen%2Fsafe-nuclear-power-plant-dismantling\" title=\"Bei XING teilen\" aria-label=\"Bei XING teilen\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#126567; color:#fff\" target=\"_blank\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 25 32\"><path fill=\"#126567\" d=\"M10.7 11.9q-0.2 0.3-4.6 8.2-0.5 0.8-1.2 0.8h-4.3q-0.4 0-0.5-0.3t0-0.6l4.5-8q0 0 0 0l-2.9-5q-0.2-0.4 0-0.7 0.2-0.3 0.5-0.3h4.3q0.7 0 1.2 0.8zM25.1 0.4q0.2 0.3 0 0.7l-9.4 16.7 6 11q0.2 0.4 0 0.6-0.2 0.3-0.6 0.3h-4.3q-0.7 0-1.2-0.8l-6-11.1q0.3-0.6 9.5-16.8 0.4-0.8 1.2-0.8h4.3q0.4 0 0.5 0.3z\"\/><\/svg><\/span><\/a><\/li><li class=\"shariff-button mailto shariff-nocustomcolor\" style=\"background-color:#a8a8a8\"><a href=\"mailto:?body=https%3A%2F%2Fbbr.news%2Fen%2Fsafe-nuclear-power-plant-dismantling&subject=Safe%20nuclear%20power%20plant%20dismantling\" title=\"Per E-Mail versenden\" aria-label=\"Per E-Mail versenden\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#999; color:#fff\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 32 32\"><path fill=\"#999\" d=\"M32 12.7v14.2q0 1.2-0.8 2t-2 0.9h-26.3q-1.2 0-2-0.9t-0.8-2v-14.2q0.8 0.9 1.8 1.6 6.5 4.4 8.9 6.1 1 0.8 1.6 1.2t1.7 0.9 2 0.4h0.1q0.9 0 2-0.4t1.7-0.9 1.6-1.2q3-2.2 8.9-6.1 1-0.7 1.8-1.6zM32 7.4q0 1.4-0.9 2.7t-2.2 2.2q-6.7 4.7-8.4 5.8-0.2 0.1-0.7 0.5t-1 0.7-0.9 0.6-1.1 0.5-0.9 0.2h-0.1q-0.4 0-0.9-0.2t-1.1-0.5-0.9-0.6-1-0.7-0.7-0.5q-1.6-1.1-4.7-3.2t-3.6-2.6q-1.1-0.7-2.1-2t-1-2.5q0-1.4 0.7-2.3t2.1-0.9h26.3q1.2 0 2 0.8t0.9 2z\"\/><\/svg><\/span><\/a><\/li><li class=\"shariff-button printer shariff-nocustomcolor\" style=\"background-color:#a8a8a8\"><a href=\"javascript:window.print()\" title=\"drucken\" aria-label=\"drucken\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#999; color:#fff\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 30 32\"><path fill=\"#999\" d=\"M6.8 27.4h16v-4.6h-16v4.6zM6.8 16h16v-6.8h-2.8q-0.7 0-1.2-0.5t-0.5-1.2v-2.8h-11.4v11.4zM27.4 17.2q0-0.5-0.3-0.8t-0.8-0.4-0.8 0.4-0.3 0.8 0.3 0.8 0.8 0.3 0.8-0.3 0.3-0.8zM29.7 17.2v7.4q0 0.2-0.2 0.4t-0.4 0.2h-4v2.8q0 0.7-0.5 1.2t-1.2 0.5h-17.2q-0.7 0-1.2-0.5t-0.5-1.2v-2.8h-4q-0.2 0-0.4-0.2t-0.2-0.4v-7.4q0-1.4 1-2.4t2.4-1h1.2v-9.7q0-0.7 0.5-1.2t1.2-0.5h12q0.7 0 1.6 0.4t1.3 0.8l2.7 2.7q0.5 0.5 0.9 1.4t0.4 1.6v4.6h1.1q1.4 0 2.4 1t1 2.4z\"\/><\/svg><\/span><\/a><\/li><\/ul><\/div><h3>The clock is ticking: From today&#8217;s perspective, the nuclear phase-out in Germany has reached its final deadline with the extension of the operating lives of nuclear power plants until April 15. Regardless of fundamental political decisions, the day will come when the technology will have to be dismantled in a costly and safe manner.<\/h3>\n<figure id=\"attachment_9760\" aria-describedby=\"caption-attachment-9760\" style=\"width: 508px\" class=\"wp-caption alignright\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-9759\" src=\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02.jpg\" alt=\"Together with technological partners, MicroStep developed and produced two radiation measurement chambers, type RTM643NG, which are operated by Entsorgungswerk f\u00fcr Nuklearanlagen GmbH in Greifswald (Mecklenburg-Vorpommern). \u00a9 MicroStep Europe\" width=\"508\" height=\"381\" srcset=\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02.jpg 2048w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02-1536x1152.jpg 1536w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02-326x245.jpg 326w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02-508x381.jpg 508w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02-768x576.jpg 768w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02-584x438.jpg 584w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02-678x509.jpg 678w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_02-80x60.jpg 80w\" sizes=\"(max-width: 508px) 100vw, 508px\" \/><figcaption id=\"caption-attachment-9760\" class=\"wp-caption-text\">Together with technological partners, MicroStep developed and produced two radiation measurement chambers, type RTM643NG, which are operated by Entsorgungswerk f\u00fcr Nuklearanlagen GmbH in Greifswald (Mecklenburg-Vorpommern).<br \/>\u00a9 MicroStep Europe<\/figcaption><\/figure>\n<p>With its diverse solutions of CNC high-end cutting systems with plasma, laser, waterjet and oxyfuel cutting technologies, MicroStep is present in more than 50 countries in many hundreds of productions worldwide. Since the cutting system, control system and software all come from the same company, MicroStep is also a sought-after partner for special solutions for all aspects of cutting and beyond. For example, for the control of hydropower plant turbines or in various robot applications &#8211; but MicroStep technologies can also be used in the dismantling of nuclear power plants.<\/p>\n<p>The story began with a project in Slovakia in the mid-2000s: solutions were sought for the disposal of Unit A1 of the Jaslovsk\u00e9 Bohunice nuclear power plant, 60 km northeast of the Slovak capital Bratislava. At that time, in close cooperation with technological partners, a portfolio of equipment was developed for measuring radiation from nuclear waste stored in containers (using gamma probes) and for measuring the radioactivity of the exhaust air in the plant&#8217;s stacks. Since 2007, MicroStep has delivered dozens of different systems to nuclear waste management facilities, nuclear institutes and power plants &#8211; most of them to Central and Eastern Europe.<\/p>\n<h4>Dismantling, disposal, storage and other organizational tasks<\/h4>\n<p>With the delivery of special radiation measurement chambers to EWN GmbH, MicroStep technology has also been in use in Germany for the dismantling of nuclear power plants since 2020. Entsorgungswerk f\u00fcr Nuklearanlagen GmbH, formerly known as Energiewerke Nord, is a state-owned company specializing in the dismantling and disposal of decommissioned nuclear power plants. Since 1995, EWN has been responsible for the former Greifswald\/Lubmin nuclear power plants in Mecklenburg-Western Pomerania and Rheinsberg in Brandenburg, among others.<\/p>\n<p>This activity is laborious. After all, the service life of a nuclear power plant does not end when it is shut down. Depending on the decommissioning method, the dismantling period may even be longer than active operation in exceptional cases. Whether immediate dismantling or exceptional case &#8211; the process takes many years in each case.<\/p>\n<figure id=\"attachment_9758\" aria-describedby=\"caption-attachment-9758\" style=\"width: 508px\" class=\"wp-caption alignleft\"><img decoding=\"async\" class=\"size-medium wp-image-9757\" src=\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03.jpg\" alt=\"The material to be tested is brought into one of the measuring chambers in a lattice box (waste container) by chain conveyor (foreground). \u00a9 MicroStep Europe\" width=\"508\" height=\"381\" srcset=\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03.jpg 2048w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03-1536x1152.jpg 1536w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03-326x245.jpg 326w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03-508x381.jpg 508w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03-768x576.jpg 768w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03-584x438.jpg 584w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03-678x509.jpg 678w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_03-80x60.jpg 80w\" sizes=\"(max-width: 508px) 100vw, 508px\" \/><figcaption id=\"caption-attachment-9758\" class=\"wp-caption-text\">The material to be tested is brought into one of the measuring chambers in a lattice box (waste container) by chain conveyor (foreground).<br \/>\u00a9 MicroStep Europe<\/figcaption><\/figure>\n<h4>Everything must be checked for radiation<\/h4>\n<p>Finally, it is necessary to dismantle the entire facility. The nuclear power plant is much more than the nuclear reactor itself. There are many components such as pumps, pipes and concrete structures that can be safely recycled through conventional means as scrap metal or as crushed concrete in road construction. On average, this means that around three quarters of the materials collected can be reused. The remaining materials are radioactive to varying degrees and must be decontaminated where possible or, as in the case of spent fuel, safely contained and stored as radioactive waste.<\/p>\n<p>Whether recycling or storage &#8211; that depends on a careful testing procedure. Comprehensive radiation measurement ensures that the materials intended for recycling are not (no longer) hazardous, that the decontamination process has been properly carried out, and that the storage containers are impermeable to radioactive waste. For the protection of people, animals and the environment, special machine systems are used for these tasks.<\/p>\n<h4>Close development partnership<\/h4>\n<p>The EWN operates two radiation measurement chambers in Greifswald to monitor and secure the hazardous materials. In 2020, the existing equipment had reached the end of its service life and needed to be replaced. The chambers used were discontinued models; accordingly, the market was probed for modern and durable solutions. EWN&#8217;s general supplier of radiation measurement equipment, the internationally active Mirion Technologies (Canberra) GmbH, brought suitable partners on board &#8211; MicroStep and TechMart s.r.o., a specialized supplier of radiation measurement technology. Together, a new generation measurement chamber, the RTM643NG, was developed in record time. Two complete plants were finally produced. These have been in reliable use ever since.<\/p>\n<figure id=\"attachment_9756\" aria-describedby=\"caption-attachment-9756\" style=\"width: 324px\" class=\"wp-caption alignright\"><img decoding=\"async\" class=\"size-medium wp-image-9755\" src=\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_05.jpg\" alt=\"Dr.-Ing. Alexander Varga, head of development at MicroStep: \"With the experience from previous projects, we were able to develop an individual and highly automated solution that offers the greatest possible safety and the certainty that the recyclable materials really are harmless.\" \u00a9 MicroStep Europe\" width=\"324\" height=\"381\" srcset=\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_05.jpg 900w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_05-324x381.jpg 324w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_05-768x903.jpg 768w, https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_05-373x438.jpg 373w\" sizes=\"(max-width: 324px) 100vw, 324px\" \/><figcaption id=\"caption-attachment-9756\" class=\"wp-caption-text\">Dr.-Ing. Alexander Varga, head of development at MicroStep: &#8220;With the experience from previous projects, we were able to develop an individual and highly automated solution that offers the greatest possible safety and the certainty that the recyclable materials really are harmless.&#8221;<br \/>\u00a9 MicroStep Europe<\/figcaption><\/figure>\n<h4>Automated solution for maximum safety<\/h4>\n<p>Each of the two chambers is equipped with a chain conveyor that transports containers of material (concrete rubble, soil, metal parts or used protective equipment) to and from the measuring chamber itself. On its way to the chamber, the container is automatically weighed and must pass through a gate of light beams and sensors. This ensures that the permissible size is not exceeded and that protruding parts cannot collide with the measuring chamber.<\/p>\n<p>Each measurement chamber is shielded with special lead plates supplied by TechMart and set into a steel frame. In the walls and doors on the inside, there are large-area, highly sensitive scintillation counters for radiation measurement, 16 in each chamber, arranged in a special measurement geometry.<\/p>\n<p>The system is operated outside the measuring chamber on a free-standing console equipped with a touch screen with a modern user interface. In standard automatic mode, all that is required is to place the container on top and issue the &#8220;Start&#8221; command.<\/p>\n<p>However, if required, the operator can also manually control the position of the scale table, hopper and front door. The measurement itself usually takes between 10 and 30 seconds and provides one of two results: The radiation level is either below the strict limit set by the German government and the material can be released for general recycling, or the limit has been exceeded and the material must be treated as radioactive waste.<\/p>\n<p>The first chamber was delivered at the end of 2020, the second one a year later. Both have been in continuous operation since then. &#8220;With the experience from previous projects, we were able to develop an individual and highly automated solution with our partners that offers the personnel the greatest possible safety and, of course, the certainty that the recyclable materials are really harmless and that only the materials that are really necessary have to be disposed of as radioactive waste,&#8221; sums up Dr.-Ing. Alexander Varga, co-founder and head of development at MicroStep.<\/p>\n<p>Web:<br \/>\n<a href=\"http:\/\/www.microstep.com\" target=\"_blank\" rel=\"noopener\">www.microstep.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">The clock is ticking: From today&#8217;s perspective, the nuclear phase-out in Germany has reached its final deadline with the extension of the operating lives of nuclear power plants until April <a class=\"mh-excerpt-more\" href=\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\" title=\"Safe nuclear power plant dismantling\">[&#8230;]<\/a><\/div>\n","protected":false},"author":3,"featured_media":9762,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[615],"tags":[789],"class_list":{"0":"post-9766","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-company","8":"tag-microstep-europe-gmbh"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Safe nuclear power plant dismantling - bbr B\u00e4nder Bleche Rohre<\/title>\n<meta name=\"description\" content=\"From today&#039;s perspective, the extension of the nuclear power plant&#039;s operating life until April 15 marks the final date for Germany&#039;s nuclear phase-out. Company\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Safe nuclear power plant dismantling - bbr B\u00e4nder Bleche Rohre\" \/>\n<meta property=\"og:description\" content=\"From today&#039;s perspective, the extension of the nuclear power plant&#039;s operating life until April 15 marks the final date for Germany&#039;s nuclear phase-out. Company\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\" \/>\n<meta property=\"og:site_name\" content=\"bbr B\u00e4nder Bleche Rohre\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-25T03:48:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1700\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hans Georg Sch\u00e4tzl\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hans Georg Sch\u00e4tzl\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#article\",\"isPartOf\":{\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\"},\"author\":{\"name\":\"Hans Georg Sch\u00e4tzl\",\"@id\":\"https:\/\/bbr.news\/en#\/schema\/person\/2d58708dd5f30d26f442ecb47a29b756\"},\"headline\":\"Safe nuclear power plant dismantling\",\"datePublished\":\"2023-04-25T03:48:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\"},\"wordCount\":1117,\"publisher\":{\"@id\":\"https:\/\/bbr.news\/en#organization\"},\"image\":{\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg\",\"keywords\":[\"MicroStep Europe GmbH\"],\"articleSection\":[\"Company\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\",\"url\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\",\"name\":\"Safe nuclear power plant dismantling - bbr B\u00e4nder Bleche Rohre\",\"isPartOf\":{\"@id\":\"https:\/\/bbr.news\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg\",\"datePublished\":\"2023-04-25T03:48:05+00:00\",\"description\":\"From today's perspective, the extension of the nuclear power plant's operating life until April 15 marks the final date for Germany's nuclear phase-out. Company\",\"breadcrumb\":{\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage\",\"url\":\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg\",\"contentUrl\":\"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg\",\"width\":2560,\"height\":1700,\"caption\":\"Vergangenheit und Zukunft: Das AKW Unterweser wird durch Windenergieanlagen ersetzt, die durch elektrische Akkumulatoren erg\u00e4nzt werden \u00a9 Ra Boe \/ Wikipedia, CC BY-SA 3.0 de\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Homepage\",\"item\":\"https:\/\/bbr.news\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Company\",\"item\":\"https:\/\/bbr.news\/en\/category\/company\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Safe nuclear power plant dismantling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bbr.news\/en#website\",\"url\":\"https:\/\/bbr.news\/en\",\"name\":\"bbr B\u00e4nder Bleche Rohre\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/bbr.news\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bbr.news\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bbr.news\/en#organization\",\"name\":\"TS MediaConsult\",\"url\":\"https:\/\/bbr.news\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/bbr.news\/en#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bbr.news\/wp-content\/uploads\/2021\/08\/cropped-logobrowserbbr.png\",\"contentUrl\":\"https:\/\/bbr.news\/wp-content\/uploads\/2021\/08\/cropped-logobrowserbbr.png\",\"width\":512,\"height\":512,\"caption\":\"TS MediaConsult\"},\"image\":{\"@id\":\"https:\/\/bbr.news\/en#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/bbr-baender-bleche-rohre\",\"https:\/\/www.youtube.com\/channel\/UCH05KnFDaqGAKUPkldd0myQ\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/bbr.news\/en#\/schema\/person\/2d58708dd5f30d26f442ecb47a29b756\",\"name\":\"Hans Georg Sch\u00e4tzl\",\"sameAs\":[\"https:\/\/bbr.news\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Safe nuclear power plant dismantling - bbr B\u00e4nder Bleche Rohre","description":"From today's perspective, the extension of the nuclear power plant's operating life until April 15 marks the final date for Germany's nuclear phase-out. Company","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling","og_locale":"en_US","og_type":"article","og_title":"Safe nuclear power plant dismantling - bbr B\u00e4nder Bleche Rohre","og_description":"From today's perspective, the extension of the nuclear power plant's operating life until April 15 marks the final date for Germany's nuclear phase-out. Company","og_url":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling","og_site_name":"bbr B\u00e4nder Bleche Rohre","article_published_time":"2023-04-25T03:48:05+00:00","og_image":[{"width":2560,"height":1700,"url":"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg","type":"image\/jpeg"}],"author":"Hans Georg Sch\u00e4tzl","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Hans Georg Sch\u00e4tzl","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#article","isPartOf":{"@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling"},"author":{"name":"Hans Georg Sch\u00e4tzl","@id":"https:\/\/bbr.news\/en#\/schema\/person\/2d58708dd5f30d26f442ecb47a29b756"},"headline":"Safe nuclear power plant dismantling","datePublished":"2023-04-25T03:48:05+00:00","mainEntityOfPage":{"@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling"},"wordCount":1117,"publisher":{"@id":"https:\/\/bbr.news\/en#organization"},"image":{"@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage"},"thumbnailUrl":"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg","keywords":["MicroStep Europe GmbH"],"articleSection":["Company"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling","url":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling","name":"Safe nuclear power plant dismantling - bbr B\u00e4nder Bleche Rohre","isPartOf":{"@id":"https:\/\/bbr.news\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage"},"image":{"@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage"},"thumbnailUrl":"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg","datePublished":"2023-04-25T03:48:05+00:00","description":"From today's perspective, the extension of the nuclear power plant's operating life until April 15 marks the final date for Germany's nuclear phase-out. Company","breadcrumb":{"@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#primaryimage","url":"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg","contentUrl":"https:\/\/bbr.news\/wp-content\/uploads\/2023\/03\/2023_1_S34_3_MicroStep_01_Luftaufnahmen_Nordseekueste-scaled.jpg","width":2560,"height":1700,"caption":"Vergangenheit und Zukunft: Das AKW Unterweser wird durch Windenergieanlagen ersetzt, die durch elektrische Akkumulatoren erg\u00e4nzt werden \u00a9 Ra Boe \/ Wikipedia, CC BY-SA 3.0 de"},{"@type":"BreadcrumbList","@id":"https:\/\/bbr.news\/en\/safe-nuclear-power-plant-dismantling#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Homepage","item":"https:\/\/bbr.news\/en"},{"@type":"ListItem","position":2,"name":"Company","item":"https:\/\/bbr.news\/en\/category\/company"},{"@type":"ListItem","position":3,"name":"Safe nuclear power plant dismantling"}]},{"@type":"WebSite","@id":"https:\/\/bbr.news\/en#website","url":"https:\/\/bbr.news\/en","name":"bbr B\u00e4nder Bleche Rohre","description":"","publisher":{"@id":"https:\/\/bbr.news\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bbr.news\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bbr.news\/en#organization","name":"TS MediaConsult","url":"https:\/\/bbr.news\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bbr.news\/en#\/schema\/logo\/image\/","url":"https:\/\/bbr.news\/wp-content\/uploads\/2021\/08\/cropped-logobrowserbbr.png","contentUrl":"https:\/\/bbr.news\/wp-content\/uploads\/2021\/08\/cropped-logobrowserbbr.png","width":512,"height":512,"caption":"TS MediaConsult"},"image":{"@id":"https:\/\/bbr.news\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/bbr-baender-bleche-rohre","https:\/\/www.youtube.com\/channel\/UCH05KnFDaqGAKUPkldd0myQ"]},{"@type":"Person","@id":"https:\/\/bbr.news\/en#\/schema\/person\/2d58708dd5f30d26f442ecb47a29b756","name":"Hans Georg Sch\u00e4tzl","sameAs":["https:\/\/bbr.news"]}]}},"_links":{"self":[{"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/posts\/9766"}],"collection":[{"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/comments?post=9766"}],"version-history":[{"count":1,"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/posts\/9766\/revisions"}],"predecessor-version":[{"id":9802,"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/posts\/9766\/revisions\/9802"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/media\/9762"}],"wp:attachment":[{"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/media?parent=9766"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/categories?post=9766"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bbr.news\/en\/wp-json\/wp\/v2\/tags?post=9766"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}